CASE STUDY: ASPHALTENES IN THE GLAUC 

Increased production 300%

THE CHALLENGE

The operator was having issues with a free-flowing well on a timer that wasn't producing properly. Feeling it was loaded up. they dropped a soap stick and shut it in for 24 hours. On startup, they immediately heard the soap stick arrive at the wellhead and inspected it. It was still intact and was covered in asphaltenes.

ReNuu was immediately called out and pumped 10 liters of Para-Solvent and 200 liters of paraffin micro-organisms down the tubing, shutting the well back in for 24 hours. The well had no trouble lifting fluid on startup. This project had a significantly positive ROI for the client.

THE RESULTS

300% production for $400. 


As the pictures indicate, the operator immediately saw increased gas production, as well as more consistent flow and pressures. Production jumped from an average of 0.66 decks per day to 1.98!
 

© 2019 by ReNuu Production Optimization Ltd.

cw-logo.png
  • Facebook