Case Study: Duvernay Wax

The operator was having issues with two free-flowing wells.

 

The first well was completely waxed off with nearly no flow, the second flowing inconsistently.

After benchmarking tests with our Para-Solvent, ReNuu pumped 20 liters of Para-Solvent and 100 liters of micro-organisms down the tubing with the wells shut-in, at a minimal cost. One well was restarted 2 hours later, cleared things up. The well had no trouble lifting condy. The second began flowing shortly after. This project had a significant positive ROI for the client, whom we continue to partner with moving forward. We are currently treating every well in the field for this customer.

Resourceful+Duvernay+Production.jpg

THE RESULTS

258% production for under $600. 

The operator immediately saw increased gas production, as well as more consistent flow and pressures. Production jumped from 8-9 decks per day to 22!

Since we started they have dropped bumper springs and plungers to optimize production more, no issues with wax were observed.